LC02 Working Group 2

    Linac Power Sources and Structures

    Conveners: Ch. Adolphsen (SLAC), Y.H. Chin (KEK), L. Lilje (DESY), H. Braun (CERN)


Detailed Schedule with Links to Talks:

WG2 Goals:

-Review status of key RF components of the different linear collider projects
-Exchange information about progress in design tools and methods
-Review status of structure breakdown & damage problems
-Identify issues to be addressed by test facilities
-Identify common R&D issues
-Collect information for TRC Report

WG2 Sessions (times to be scheduled when presentation list more firm):

Session 1 - Klystrons

    -Klystrons for NLC/JLC, C-band, TESLA, CLIC
    -Advanced Concepts (Sheet-Beam, Multi-Beam, Gridded Gun ..)

Session 2 - Modulators

    -Modulators for NLC/JLC, C-band, TESLA, CLIC
    -Advanced Concepts (Hybrid, Gridded Gun Supply, ..)

Session 3 - RF Distribution

    -Drive beam developments for CLIC
    -Pulse compression for NLC/JLC, C-band
    -Active/Passive Switches

Session 4 - Accelerator Design

    -Accelerator/Transfer structure design and related tools and methods
    -Structure Fabrication and QC methods

Session 5 - Accelerator Operation

    -Accelerator structure high gradient performance
    -Characteristics of rf breakdown

Session 6 - System Operation

    -RF system integration, reliability, industrialization
    -Discussion of relevant test facility activities

Session 7 - Summary

    - Discussion of WG2 results with special emphasis on input for TRC


Contact  lc02@slac.stanford.edu
Last Update: 03/07/02 07:56:36 AM
SLAC