|
Tentative List of Presentations |
| Monday 13:30,
Interaction Region Overview |
|
|
|
|
|
|
30 |
Organization / Working Group Discussion |
Conveners / all |
|
35+5 |
NLC IR Overview |
T. Markiewicz |
|
25+5 |
Photon
Collider Interaction Region Issues |
J. Gronberg |
|
35+5 |
CLIC Beam Delivery System |
F. Zimmermann |
|
|
|
|
|
|
|
|
| Tuesday 9:00,
Interaction Region Overview |
|
|
|
|
|
|
15+5 |
Beam
Stability in the Main Linac of CLIC |
D. Schulte |
|
35+5 |
JLC IR Overview |
Tauchi-san |
|
35+5 |
TESLA
Interaction Region: IR Layout, Beam Induced Backgrounds |
O. Napoly |
|
|
|
|
|
|
|
|
| Tuesday 11:00 Background
Calculations |
|
|
|
|
|
|
15+5 |
Machine
Backgrounds in CLIC |
F. Zimmermann |
|
15+5 |
Beam-Beam
Instability Driven by Wakefield Effects in Linear Colliders |
D. Schulte |
|
25+5 |
Neutron
Background at TESLA |
G. Wagner |
|
15+5 |
History
of Muon Backgrounds at SLAC |
L. Keller |
|
|
|
|
|
|
|
|
| Tuesday 13:30 Detector
Design Issues |
|
|
|
|
|
|
25+5 |
Detectors
from the North American LC Working Group |
B. Schumm |
|
25+5 |
TESLA
e+e- Detector Studies |
R. Settles |
|
25+5 |
A Study
of A JLC Detector |
Aihara-san |
|
25+5 |
TESLA
e+e- Detector Studies |
R. Settles |
|
15+5 |
Prospects
for Discovery of a light A at a Low Energy Collider |
D. Asner |
|
|
|
|
|
|
|
|
|
|
|
|
| Wednesday 9:00,
Gamma-Gamma colliders |
|
|
|
|
|
|
40+5 |
The
Photon Collider at TESLA |
V. Telnov |
|
15+5 |
Laser
Source for the NLC Photon Collider |
J. Early |
|
15+5 |
Structural
Analysis of Photon Collider Beam Dump Window |
T. Hill / W. Stein |
|
|
NLC
gg
Beam Dump |
T. Hill |
|
|
|
|
|
|
|
|
| Wednesday 11:00, Energy
Measurement and Polarimetry |
|
|
|
|
|
|
30+5 |
(Some)
Aspects of Polarimetry at the Future Linear Collider |
M. Woods |
|
30+5 |
Energy Spectrometry experience at LEP2 |
E. Torrance |
|
15+5 |
Model
4 TESLA Diople Magnet toward Final Focus Quadrupole |
Kumada-san |
|
|
|
|
|
|
|
|
| Wednesday 13:30, LINX
test facility |
|
|
|
|
|
|
35+5 |
LINX:
Linear Collider IR-FF Facility at SLAC |
A. Seryi |
|
15+5 |
LINX
yy Test Bed |
J. Gronberg |
|
25+5 |
Opto-Mechanical
Design of the LINX yy Interaction Region |
K. Skulina |
|
15+5 |
Laser
Alignment & Monitoring at the Conversion Points for the LINX y-y
Collider |
G. Sommargren |
|
25+5 |
Sphinx physics |
M. Velasco |
|
|
|
|
|
|
|
|
| Thursday 9:00,
Collimation and Beam Delivery |
|
|
|
|
|
|
|
Joint with WG03 |
|
|
|
|
|
|
|
|
|
| Thursday 11:00,
Collimation and Beam Delivery II |
|
|
|
|
|
|
|
Joint with WG03 |
|
|
|
|
|
|
|
|
|
| Thursday 13:30, Feedback
and Stabilization |
|
|
|
|
|
|
25+5 |
FD
Stabilization in NLC |
A. Seryi |
|
25+5 |
IP
Stabilization for the NLC |
J. Frisch |
|
45+5 |
Feedback
On Nano-seocnd Timescales: IP Feedback Simulations |
G. White |
|
15+5 |
FONT experiment status |
S. Jolly |
|
15+5 |
The
TESLA (TDR) Beam Delivery System |
N. Walker |
|
|
A
Fixed Target Program at the NLC |
R. Pitthan |
|
|
Structure
Design |
Yeremian |