Return to LC/02 Home Page

LC02 Working Group 4

 
IP and Experimental Issues (including g-g )
Conveners: P. Burrows (Oxford), J. Gronberg (LLNL), R. Settles (MPI Munich), H. Aihara (Tokyo)

    WG4 Goals:

-Review the status of interaction region design, including:

Tentative List of Presentations

Monday 13:30,  Interaction Region Overview
  
30 Organization / Working Group Discussion Conveners / all
35+5 NLC IR Overview T. Markiewicz
25+5 Photon Collider Interaction Region Issues J. Gronberg
35+5 CLIC Beam Delivery System F. Zimmermann
  
Tuesday 9:00,  Interaction Region Overview
  
15+5 Beam Stability in the Main Linac of CLIC D. Schulte
35+5 JLC IR Overview Tauchi-san
35+5 TESLA Interaction Region: IR Layout, Beam Induced Backgrounds O. Napoly
  
Tuesday 11:00  Background Calculations
  
15+5 Machine Backgrounds in CLIC F. Zimmermann
15+5 Beam-Beam Instability Driven by Wakefield Effects in Linear Colliders D. Schulte
25+5 Neutron Background at TESLA G. Wagner
15+5 History of Muon Backgrounds at SLAC L. Keller
  
Tuesday 13:30  Detector Design Issues
  
25+5 Detectors from the North American LC Working Group B. Schumm
25+5 TESLA  e+e- Detector Studies R. Settles
25+5 A Study of A JLC Detector Aihara-san
25+5 TESLA e+e- Detector Studies R. Settles
15+5 Prospects for Discovery of a light A at a Low Energy Collider D. Asner
  
Wednesday 9:00,  Gamma-Gamma colliders
  
40+5 The Photon Collider at TESLA V. Telnov
15+5 Laser Source for the NLC Photon Collider J. Early
15+5 Structural Analysis of Photon Collider Beam Dump Window T. Hill / W. Stein
NLC gg Beam Dump T. Hill
  
Wednesday 11:00,  Energy Measurement and Polarimetry
  
30+5 (Some) Aspects of Polarimetry at the Future Linear Collider M. Woods
30+5 Energy Spectrometry experience at LEP2 E. Torrance
15+5 Model 4 TESLA Diople Magnet toward Final Focus Quadrupole Kumada-san
  
Wednesday 13:30,  LINX test facility
  
35+5 LINX: Linear Collider IR-FF Facility at SLAC A. Seryi
15+5 LINX  yy  Test Bed J. Gronberg
25+5 Opto-Mechanical Design of the LINX yy Interaction Region K. Skulina
15+5 Laser Alignment & Monitoring at the Conversion Points for the LINX y-y Collider G. Sommargren
25+5 Sphinx physics M. Velasco
  
Thursday 9:00,  Collimation and Beam Delivery
  
Joint with WG03
  
Thursday 11:00,  Collimation and Beam Delivery II
  
Joint with WG03
  
Thursday 13:30,  Feedback and Stabilization
  
25+5 FD Stabilization in NLC A. Seryi
25+5 IP Stabilization for the NLC J. Frisch
45+5 Feedback On Nano-seocnd Timescales: IP Feedback Simulations G. White
15+5 FONT experiment status S. Jolly
15+5 The TESLA (TDR) Beam Delivery System N. Walker
A Fixed Target Program at the NLC R. Pitthan
Structure Design Yeremian

Contact  lc02@slac.stanford.edu
Last Update: 04/08/02 07:04:56 AM
slac