Return to LC/02 Home Page

Working Groups

LC02 Working Group Structure

  1. Sources, Damping Rings, and Bunch Compressors (including e-e-)
  2. Linac Power Sources and Structures
  3. Linac and Beam Delivery Dynamics and Control
        Beam Optics, Dynamics, and Tuning
        Instrumentation, Control, and Feedback
  4. IP and Experimental Issues (including g-g )
  5. Engineering, Construction, and Operational Issues (including GAN)
        Conventional Facilities, Tunnel Layout, and Site Requirements
        Reliability, Maintenance, and Operations

To submit a paper or schedule a presentation at the workshop please contact one of the conveners of the appropriate working group.


Contact us at lc02@slac.stanford.edu
SLAC
Page Owner: Nixx
Last Update: 12/11/02 10:48:22 AM